Manufacturing Process: | Brazing |
---|---|
Application: | Stone |
Certification: | CE |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Product Name | diamond saw blade | Modes of packing | Netural packing |
Brand | SHDIATOOL | Colour | blue or as your request |
Diameter | 4.5'',5'',6'',7'',9'',10'',12'',14'',16'' | Thickness | 2.3-3.6mm |
Grits | 30 | Place of Product | Shanghai ,China |
Feature:
A variety of materials can be cut through, which can be used in fire/rescue/engineering scenes, with a wide range of uses
Contributes to improved saw blade performance (higher sharpness) for heat dissipation and chip evacuation
Protects the blade base for improved life and performance
Greatly improve product quality and life, higher efficiency and lower cost
Dry working without water
Application: Designed to cut through the tough materials, including granite marble, Aluminum, Auto Body Panels, Cast Iron, Copper Pipe, Corrugated Roofing, Drywall, Ductile Iron Pipe, Fire Door, Masonry, Plastic, PVC, Rebar, Reinforced Concrete, Steel Metal.
SHIPPING:
Deliver time | Asia/Australia | West Europe | East Europe | Africa | North America | South America |
epacket | 5-10 days | 5-15 days | 5-15 days | 15-50days | 5-10days | 15-30days |
DHL/UPS | 4-6days | 4-9days | 4-9days | 5-10days | 4-6days | 5-10days |
FedEx | 5-9days | 5-9days | --------- | --------- | 3-7days | |
By Air | 7-15days | 7-20days | 10-20days | --------- | 10-20days | --------- |
By Sea | 22-40days | 50-60days | 50-60days | --------- | 14-35days | --------- |
By Land | 15-30days | 22-50days | 22-50days | --------- | 20-30days | --------- |
1)Produce diamond tools with different models or sizes as per your request. (OEM or ODM Service)
2)Provide free sample testing for bulk orders.
3)Finish production and deliver the goods in time as scheduled.
4)Provide great after-sale service, and technique support.
5)All quality failure can be fully compensated.
Suppliers with verified business licenses